Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

LOD – Level of Development – BIM – Life-cycle

Building Information Management

Level of development (LOD) relative to the life-cycle management of the built environment (BIM) should have a solid framework relative to ONTOLOGY. While the definition of “life-cycle” has many permutations, and is likely to undergo ongoing improvement, the relationship to LOD needs to be developed in parallel.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Forget “BIM”, and Get on Board with BLM – Building / Built Environment Life-cycle Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. BLM – Building Life-cycle Management requires fundamental process changes within all participating organizations / stakeholders and the associated integration and use of multiple competencies, processes, and technologies.

article thumbnail

Life-cycle management of the built environment – To BIM or Not to BIM?

Building Information Management

Waste is rampant in the Architecture, Engineering, Construction, and Building Owner and Operations Sector (AECOO). BIM, building information modeling, is defined as the life-cycle management of the built environment supported by digital technology. That said, we are not acting as stakeholders of our built infrastructure.

article thumbnail

Behind the Build: Interview with Isabel Harlan, Sr. Engineer and Project Manager at Hatch LTK

Autodesk Construction Cloud

Isabel Harlan , Senior Engineer and Project Manager at Hatch LTK , has learned to expect unexpected challenges in engineering. We recently spoke with Isabel to discuss her role and how LTK Engineering Services was acquired into the new Hatch LTK organization. Before I started engineering, I’d never even taken physics.

article thumbnail

Consensus-based standards are Required across the architecture, engineering, construction, owner and operator (A/E/C/O/O) industry

Building Information Management

Collaboration and integrated, efficient project delivery methods are needed to achieve productivity gains within the architecture, engineering, construction, owner and operator (A/E/C/O/O) industry. federal departments/agencies, as well as state/county/local governments, colleges/universities, healthcare, and airports/transportation.

article thumbnail

1,500th Envision Sustainability Professional Credentialed

Green Building Law Update

It has been used for nearly every type of project imaginable from roads to Brownfield redevelopment, from airport expansions to fisheries, from wastewater to drinking water treatment plans, and from pipelines to transmission lines. The emergent rating system is in use, but not regulatory, in over 150 U.S.