This month, we have 20+ product releases across Autodesk Construction Cloud platform and products including Autodesk Build, Autodesk BIM Collaborate, BuildingConnected, ProEst, and BIM 360. And because your time is valuable, we don’t need you to sweat the details. As always, transmitting is based on folder permissions.

Autodesk 111
article thumbnail

LEAN JOC – Job Order Contracting

Job Order Contracting

The approach invests more resources earlier in the Project life-cycle. Work scope is developed and communicated is more detail and more effectively, resulting in the avoidance of traditionally prevalent delays, change orders, and associated skyrocketing costs. Asset Life-cycle Total-cost-of-ownership (TCO) Management www.4BT.us.

Contract 132
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Job Order Contracting. The Obstacles.

article thumbnail

BIM and The Role of a Construction Cost Estimator

Building Information Management

Professional construction cost estimators are critical to any collaborative, transparent, and productive BIM solution. Owners, AEs, Contractors, Sub-Contractors, Oversight Groups, Business Product Manufacturers- BPMs, and the Community will all gain higher visibility into life-cycle needs and impacts of the built environment.

article thumbnail

BIM Collaboration – Fact or Fiction?

Building Information Management

BIM Collaboration – Fact or Fiction. The design-bid-build construction delivery method and associated practices such of awarding contracts to the lowest bidder do little more than a fuel to the fires of waste, protracted project timelines, change orders, and legal disputes.

BIM 55
article thumbnail

A Step Closer to BIM? NIBS and AIA Working toward Centralized Building Information Resource

Building Information Management

Also, the “let’s keep the Owner in the dark” or the “let’s not work together”, and the “bid low and make it up in change orders” , or “let’s accept the lowest bid and hope for the best” approaches to ruin.

article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .