Remove Bidding Remove Change Orders Remove Materials Remove Subcontracting
article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Using these granular elements and sharing the associated descriptions, l abor, material, and equipement details in a standardized format (CSI MasterFormat) with all project participants within a robust collaborative process is the path to significant cost savings and the mitigation of change orders, disputes, and waste.

Travel 177
article thumbnail

IDIQ Construction Contract Guide

Job Order Contracting

Time and Materials – for simpler/smaller tasks. MATOC (Multiple Award Task Order Contract) or MACC (Multiple Award Construction Contract) – for larger construction projects. Pre-established labor rates and/or materials markup. No ability to subcontract—limited to trade specified in the contract. T and M Basics. •

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Digital Builder Podcast Ep 22: How Specialty Contractors Can Navigate Contracts & Get Paid On Time

Autodesk Construction Cloud

Best practices for handling change orders. She recalls her experience speaking with a fellow attorney who had to go through a 129-page subcontract that could have been cut down to ten pages. “It’s As Karalynn puts it, “subcontractors and material suppliers supply the labor, supply the material and wait to get paid.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

A Job Order Contract Execution Guide is a required element for any successful, best management practice JOC Program. The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. The JO will be, in part, the.

Contract 100
article thumbnail

Construction Forms for excel

Construction Cost Estimating

Construction Forms for Excel include : Estimation Forms for Construction: Bid Plan Log, Time and Materials Log, Estimate Sheet, Job Estimate, Telephone Bid Sheet, Itemized Proposal, Job Cost Report, Take Off Estimate, Time and Materials Estimate, Request for Proposal Log, Overhead Calculation.

Lien 45
article thumbnail

#100:  Dealing With Rising Costs

NH Construction Law

It’s no secret to anyone involved in the construction industry that materials prices have been increasing by leaps and bounds recently. Sometimes the benchmark is budgeted costs, i.e., the contractor’s actual buyout costs at bid time (or those of their subs if the subcontract prices are similarly allowed to fluctuate).

Deals 40
article thumbnail

#108:  Replacement Contractor Issues

NH Construction Law

At the bid stage, even with the original plans and specs and any change orders or updated drawings in hand, the completion contractor won’t be able to spot every potential error in the existing work, and so will pad his bid – or insist on a cost-plus arrangement – to protect himself against unseen issues.