Remove BIM Remove Change Orders Remove Document Remove Documentation
article thumbnail

What Is a Change Order?

Autodesk Construction Cloud

What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

Why It’s Time for Contractors to Adopt Collaborative BIM

Viewpoint Construction Technology

Building Information Modeling (BIM) isn’t a new concept in construction. Despite its benefits, however, BIM adoption isn’t as widespread in construction as some might think, according to recent industry findings. While 27 percent of companies reported having a BIM/VDC department, 28 percent said they don’t bid on BIM projects.

BIM 187
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Is a BIM Mandate Coming to the US?

Viewpoint Construction Technology

As we discussed in a recent blog post , the JBKnowledge 2017 Construction Technology report found that building information modeling (BIM) adoption in the United States has been fairly slow, with only 27 percent of construction companies having a BIM department. So will the United States ever have a BIM mandate?

BIM 200
article thumbnail

Innovative Solution Integrates Planning, Procurement, and Project Delivery to Improve Construction Productivity

Job Order Contracting

contact-form]. The post Innovative Solution Integrates Planning, Procurement, and Project Delivery to Improve Construction Productivity appeared first on 4BT.

article thumbnail

OpenBUILD(TM) The ONLY Construction Integrated Project Delivery Solution with Locally Researched Cost Visibility

Job Order Contracting

OpenBUILD(TM) is The ONLY Construction Integrated Project Delivery Solution with Locally Researched Cost Visibility with Program Management, Contract Management, Proposal/Bid/Estimate Management, Workorder Management , Project Management, Document Management, Team Management, Issues/Task Management, Workflow Management, and BIM integration.

article thumbnail

40+ Fresh Product Releases You Should Know in January

Autodesk Construction Cloud

This month, we have 40+ product releases across Autodesk Construction Cloud , including Autodesk Build, Autodesk BIM Collaborate, Autodesk Takeoff, BuildingConnected, and Assemble. Files | Search Multi-page PDFs – Members can now search for text matches across multiple pages of PDF documents in the Files tool.

Products 105
article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Any required documentation and/or forms.