article thumbnail

Construction Cost Knowledge Management

Job Order Contracting

The ability to clearly define detailed line item tasks defining the desired scope of work is critical to mitigating errors and omissions, reducing the number of change orders, as well as achieving defensible cost visibility and transparency. The transfer of cost knowledge is essential at a granular, task level.

article thumbnail

Adaptive Construction Planning, Procurement, and Project Delivery

Job Order Contracting

Program Management Contract Management Project Management Work Order Management Full Document Management (version control, inclusive of document “check-in/check-out”) Building Management Geolocation Space Management Component Management Issues/Task Management Team Management Contractor/Subcontractor Management MBE/WBE/HUBZONE… Management BIM Viewing (..)

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM and Cloud Computing – Get Beyond 3D Visualization and Focus Upon the “I”

Building Information Management

BIM and the Cloud – SAME 2012 – 4Clicks Solutions LLC – PDF. BIM - CLOUD COMPUTING. . BIM (Building Information Technology) and THE CLOUD (Cloud Computing) are disruptive technologies converging to significantly alter traditional construction and facility management practices. Definition of BIM. .

BIM 78
article thumbnail

4 No-Brainer Workflows with Autodesk Construction Cloud Connect 

Autodesk Construction Cloud

Using ACC Connect, you can integrate files and create custom workflows between SharePoint and Autodesk Build, Autodesk Docs, BIM 360, or PlanGrid. . Egnyte is a hybrid (on-premises & cloud-based) content management solution that facilitates secure management and governance of critical content. 2: Project Management.

Autodesk 105
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are altering the basic foundations of the AECOO sector (Architecture, Engineering, Construction, Owners, and Operations). BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are.

BIM 40
article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

Field specific variables, such as weather, on-going operations, soils conditions, security, safety, site lay-out, environment protections and other contexts must be considered as well as the means and methods of work execution. The next aspect is of course BIM. As an example of productivity improvements afforded by JOC.

article thumbnail

The importance of keeping construction daily logs for every site activity

Lets Build

Your construction daily log shows why, how, and when changes occur and decisions are made; this enables everyone on-site to stay productive, maintain transparency, and, ultimately, reduce delays and unnecessary change orders. If you’re like most site managers, you probably chose the latter.

Site 148