Remove BIM Remove Concrete Remove Documentation Remove Schedule
article thumbnail

Classes for Field Teams at AU 2023

Autodesk Construction Cloud

CS600071 | CIP STR Concrete Modeling with Revit and Field Layout with Leica iCON This session will be a presentation of structural cast-in-place concrete modeling with Revit software. Come and see Baker Concrete Construction, Inc. BAM will share how its digital approach to work planning delivers value to project stakeholders.

Autodesk 102
article thumbnail

EdiLus-RC – A powerful software for concrete design & reinforced concrete structural calculation

Construction Cost Estimating

EdiLus-RC is an exclusive software for making perfect concrete design that deals with structural calculations toward new and subsisting buildings in reinforced concrete by means of the most simple and effective SMART BIM object input. The first structural calculations BIM software for reinforced concrete buildings.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Five Causes of Construction Rework and How to Avoid Them

Fieldwire

It typically means some portion of work has to be redone to fix a problem, often with adverse schedule and cost impacts. Planning and Scheduling Problems. Schedule issues can lead to numerous problems on projects, one of which is rework. Rework is a word no one wants to hear on a construction project.

article thumbnail

Enabling real-time collaboration in Egyptian construction

Autodesk Construction Cloud

Not only that, but the fact that there are no conflicts between different versions being worked on by different teams also saves huge amounts of time, stress and rework, says Ahmed Nafea, Building Information Modelling (BIM) manager in Polar Management, the project management arm of Redcon. It worked well once we had that.

article thumbnail

Data-Driven Insights Improving Quality With Alkondor

Autodesk Construction Cloud

With their own production facility in the Netherlands, 150 employees support Alkondor’s activity including Chris Schoneveld , BIM Manager and Bram Kotter , CEO. At the time, the team used many time-consuming processes which included printing physical copies of PDF documents and delivering them between departments and to the factory manually.

BIM 52
article thumbnail

Innovative Approaches and The Role of Reinforced Concrete

BIM & Beam

The Martin/Martin CES team has innovatively addressed the issue of fragmented fabrication drawing production that design and construction teams consistently encounter with today’s increasingly tight project delivery schedules. almost concurrently with the issuance of the construction documents.

article thumbnail

Jobsite 3D Mobile Scanning Tech Launched for Spot Robot Dog

Construction Junkie

Back when we used to be able to interact with people in person, FARO would always bring a branded Spot with them to trade shows, like the aforementioned AU and the World of Concrete. The FARO Trek integration provides customers with the ability to document true as-built conditions of their site in a repeatable fashion.

Mobility 105