Remove BIM Remove Procurement Remove Reference Remove Visualization
article thumbnail

30+ Releases for Autodesk Construction Cloud

Autodesk Construction Cloud

In November, we have more than 30 product releases across Autodesk Construction Cloud platform and products including Autodesk Build, Autodesk BIM Collaborate, Autodesk Takeoff, Assemble, BuildingConnected, and BIM 360. Autodesk BIM Collaborate . features on both Autodesk Construction Cloud unified platform & BIM 360 .

article thumbnail

Why BIM is failing.

Building Information Management

3D visualization is not BIM. BIM is the process of efficient life-cycle management supported by digital technology. BIM requires a more robust linkage (as is the case with JOC) between construction delivery and life-cycle management process and technology, to achieve a similar gain in momentum. operations) sector.

BIM 79
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The lifecycle of a detail – BIM and butterflies

DebunkTheBIM

In the past, I tried to use all sorts of parallels to explain this idea, from the ideas of visual skeletons, to coatracks fixed in space, but I still find myself meeting blank stares when I try sharing this as the ‘BIG secret’. For a successful project, these references get fixed as soon as it is possible, and are not moved.

BIM 60
article thumbnail

OMNICLASS vs. UNICLASS / UNICLASS2 – BIM Ontology

Building Information Management

For a review of OmniClass in general, refer to the separate article OmniClass: a critique. This means that the Table can’t properly serve design-build and design-build-operate procurement (which, in the latter case, typically requires the contractor to be involved from the very beginning of the project, as part of a consortium).

BIM 40
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. The business strategy leading to the integration of previously disparate competencies, business processes, technologies, and teams is the primary goal of a BIM execution plan.

BIM 40
article thumbnail

Construction Cost Estimating Trends – 2014 and Beyond

Building Information Management

Integration of estimating with business and procurement “best practices”/business process will be the norm (LEAN, IPD, JOC, BIM). Required use of reference cost data across all sectors. Standard use of visual estimating tools (i.e. eTakeoff /BIM/QTO). Availability of international cost/performance data.

article thumbnail

Construction Cost Estimating Trends – 2014 and Beyond

Building Information Management

Integration of estimating with business and procurement “best practices”/business process will be the norm (LEAN, IPD, JOC, BIM). Required use of reference cost data across all sectors. Standard use of visual estimating tools (i.e. eTakeoff /BIM/QTO). Availability of international cost/performance data.