Remove Blog Remove Design Remove Inspections Remove Schedule
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

Effective Marketing For Diverse Construction Job Categories

Construction Marketing

Architects Design and plan construction projects, considering both aesthetic and functional aspects. Engineers (Civil, Structural, Mechanical, Electrical) Civil engineers focus on the design and maintenance of infrastructure. Structural engineers design and analyze structures for stability and safety.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How To Set Up Solar Panels In A Commercial Building

Construction Marketing

Therefore, it’s equally crucial to inspect your roof so you can decide where to put the solar panels. The right racking system can be selected by design engineers, guaranteeing that the modules are securely fastened without harming your roof. . Ensure That The Solar Design Meets State Regulations And Manufacturer Requirements.

article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

All You Need To Know About Construction Project Management To Get Started

Construction Marketing

This process is called a design, bid, and build contract. Alternatively, the design, build contract style means that the same company will handle both the designing and construction of the building itself. The management team will inspect the building and identify any errors or defects and get them rectified.

article thumbnail

Free Interior Design Softwares

The Constructor

All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building’s user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics).

Software 114