Remove Books Remove Change Orders Remove Documentation Remove Drawings
article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). JOC PROCEDURES FOR ORDERING WORK.

article thumbnail

QA and QC in Construction

Fieldwire

As a tool, QC can be thought of as a corrective tool, typically carried out by a specific group of individuals on a job site; the inspectors and project engineers who walk and document items that need corrective action. Read more → Paper drawings in the field are completely replaced by digital drawings. There are many more.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

A Job Order Contract Execution Guide is a required element for any successful, best management practice JOC Program. The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. the time of award. Small Tools.

Contract 100
article thumbnail

The Life-cycle of a Job Order Contract

Building Information Management

The “Contract Specialist” in coordination with the PM sets up a joint site visit with the JOC Contractor to further defined project/”task order” requirements and establish are joint “scope of work” (SOW). Drawings, typically in PDF format, are included. Contractor Estimate. Owner Estimate.

article thumbnail

Integrated project delivery method

Job Order Contracting

A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. . Unit Price Books – Pros and Cons. They are aware of the traditional waste and productivity issues and are beginning to demand change.

article thumbnail

3 ways to avoid defects in construction

Lets Build

Design defects are a result of the design team failing to produce organised and accurate construction documents. Defects due to omission are typically fixed through change orders that add to the scope of work for one or more contractors. Inefficient document distribution. Store your documents in one place.

article thumbnail

Job Order Contracting Basic Definitions

Job Order Contracting

A form signed by appropriate Owner authorized party attesting to the Contractor’s right to receive payment for certain completed portions of the Work associated with a JOC Project/Job Order. CONTRACT / JOB ORDER CONTRACT. It includes several Contract Documents, including a JOC Operations Manual / JOC Program Execution Manual.

Contract 100