Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

The J OCPB (JOC Price Book: reflects the current local costs in detail for construction tasks expected to be performed in the geographical area of the base contract with the primary use of developing a detailed line-item price. This is a national average cost book that DOES NOT REFLECT LOCAL COSTS. 5117.9001 Definitions.

Contract 228
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The JOC Contract shall use the current calendar year issue of locally researched unit price cost data equivalent to the OpenJOC(TM) Unit Price Book – UPB (subsequently referred to as UPB) with updates as applicable, as a basis for unit cost. coefficient (reference table of allowable overhead). may not, be identified in the UPB.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

“Coefficient” – a numerical factor that represents costs (generally indirect costs) not considered to be included in the “Unit Price Book” (UPB) unit prices (e.g., Informal (shop) drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under JOC. JOC Characteristics. (a)

Contract 100
article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

County, State, and Local Governments, include secondary education unfortunately continue to use JOC simply as a means to speed delivery and bypass traditional procurement versus as a LEAN collaborative construction delivery method. As used in this subpart –. AFARS Revision #15, dated February 17, 2005]. “Non-prepriced

Contract 100
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

article thumbnail

Development of the Job Order Contracting (JOC) Process for the 21st Century

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. The contract predefines basic construction units of work in a unit price book (UPB). Construction tasks not included in the unit price book may be negotiated.

article thumbnail

Developing a Job Order Contracting Program

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. The contract predefines basic construction units of work in a unit price book (UPB). Construction tasks not included in the unit price book may be negotiated.