article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

But that’s not all, the DoD doesn’t leverage current system thinking and robust, integrated planning, procurement, and project delivery workflows to maximize utilization of resource. as-built drawings and warranties). Architect-engineer services as defined in FAR 36.102 and Design-Build requirements as defined in FAR 36.3

Contract 227
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). The ORGANIZATION NAME Procurement Authority will authorize a Job Order (JO) for performance of work, or request additional information/changes. The UPB costs should NOT include contractor overhead and profit. UPB rate and the Contractor’s multiplier. Field Office Expense.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

article thumbnail

Developing a Job Order Contracting Program

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. The article introduces the Center for Job Order Contracting Excellence (CJE) and the first documented performance of JOCs. Introduction. Submit the bid.

article thumbnail

Development of the Job Order Contracting (JOC) Process for the 21st Century

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. The JOC Paper introduces the Center for Job Order Contracting Excellence (CJE) and the first documented performance of JOCs. Introduction. Submit the bid.

article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

County, State, and Local Governments, include secondary education unfortunately continue to use JOC simply as a means to speed delivery and bypass traditional procurement versus as a LEAN collaborative construction delivery method. Architect-engineer services as defined in FAR 36.102 cannot be acquired under JOC. 5117.9004-3 Ordering. (a)

Contract 100
article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). JOC is used to execute repair, sustainment, restoration, modernization, and minor new construction projects.

Contract 100