Remove CAD Remove Deals Remove Documentation Remove Visualization
article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality Capture 

Autodesk Construction Cloud

For starters, you’re dealing with an old structure without CAD files and limited documentation. As the project progresses, leaders can take floor-by-floor laser scans to capture and document work being done or as-builts. It’s an exciting project, but it also comes with a host of challenges.

Design 119
article thumbnail

The “I” in BIM, OMNICLASS, and the Criticality of Getting it RIGHT…. Now!

Building Information Management

In order to efficiently manage the life-cycle of the build environment, robust process, terms, and decision support tools are required that deal with physical and functional conditions, costs, priorities, risks, etc. Progress towards compiling new abbreviations to submit to the United States National CAD Standard® consensus process.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Behind the Build: Interview with Justin Lipsey, VDC Technical Leader, SSOE

Autodesk Construction Cloud

A VDC rotation slot happened to open up, and at that time I didn’t really know a great deal about VDC. We also want to better visualize that kind of information in a palatable way for our users. . Then empower them through the use of data to visualize the end goal. . I just had a very broad idea of what it was. .

BIM 52
article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

Ivana shares how Mace saved 50% of their time spent on coordination and reporting by using BIM 360 Document Management and Model Coordination. How you approach the preconstruction phase—which involves ironing out your plans, designs, and documentation—can make or break the ease in which you move through a project.

article thumbnail

OMNICLASS vs. UNICLASS / UNICLASS2 – BIM Ontology

Building Information Management

We can’t rely on this mapping being delivered through the geometrical part of BIM (CAD) since many systems and products are not modelled geometrically at all. It has a construction phase focus, and so has no homes for the specification of high-level objects such as Complexes, so it can’t deal with early project stages.

BIM 40
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

The project proposes sustainable solutions for Detroit’s 48204 ZIP code • Led the initiative to transition from CAD to BIM construction documentation and introduced several technical innovations to streamline operations • Created a custom BIM content library with hundreds of host components and subcomponents. Karla Tuten, 29.