article thumbnail

Timeline to Zero: Actionable Steps to Achieve ILFI Zero Carbon Certification

Stok

With the recently launched International Living Future Institute (ILFI) Zero Carbon Certification (ZCC) – the first third-party certified Zero Carbon global standard – achieving and verifying Net Zero Carbon performance is now within reach. Note that the ZCC certification also allows for off-site renewables if they meet certain requirements.

article thumbnail

GHG, SHG, SEC Regulations – Facilities Regs and Reporting Changes Coming Soon

Job Order Contracting

The proposed rules draw from existing disclosure frameworks including the Task Force on Climate-Related Financial Disclosures and the Greenhouse Gas Protocol. The journey towards efficient life-cycle management of the built environment, carbon literacy, and LEAN process is not easy. Conclusion. Change is difficult for everyone.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Everything you need for building and project management

Job Order Contracting

Building in Cloud utilizes the benefits of BIM (Building Information Modelling), to increase levels of efficiency and collaboration between team members involved in the design, construction and operational phases of the building life-cycle. Instant access to drawings using Building in Cloud built-in DWG viewer. Encryption.

article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. Finally, complementing and adding the information is in the life-cycle physical asset model is simplified using a CDE. The Designer”.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

All drawing like Plan, Elevation, Section. Structural Certificate. Architect Certificate. Foundation work is done based on drawings provided by the architect. according to building drawing. During this carefully and as per drawing, gaps are laid for windows and doors during the masonry work. Land Survey.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings.

BIM 45
article thumbnail

20 construction industry trends to watch in 2020

Building Radar

Now the data already recorded for the EnEV certificate can be used as the basis for a building eco-balance. Subsequent service providers also benefit from data material and drawings. In the best case, the idea of sustainability is pursued throughout all phases of the building life cycle.