Remove Certification Remove Drawings Remove Travel Remove Visualization
article thumbnail

Door Closer Hinges: A New Approach

Construction Specifier

To be used in an opening in a fire-resistance-rated wall or partition, closer hinges should be labeled by a recognized product certification service for use with fire-resistant doors. Reinforcement installed in the fabricator’s shop requires coordination of shop drawings. Listed for fire-rated construction. Durability and strength.

article thumbnail

Illinois: Unveiling the Future of Digital Design and Manufacturing

Business Facilities

Located on Goose Island, the 64,000-square-foot lab features collaborative office space, visualization facilities, interactive teaching areas, and a manufacturing floor for cutting-edge industrial research, with a special focus on digital innovations. The lab occupies 64,000 square feet of a former, 285,000-square-foot factory.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

Certifications • Florida Building Contractor. Education • MBA, Leadership Concentration, Liberty University • BA, Political Science, Virginia Polytechnic Institute and State University • Postbaccalaureate Graduate Certificate in Business Administration, Virginia Commonwealth University. Akel Homes. Delray Beach, Fla. .

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings. Steve received his Certificate of Management – Building Information Modeling from the AGC in 2011.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings. Steve received his Certificate of Management – Building Information Modeling from the AGC in 2011.

BIM 40
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect for corrosion. Make a visual inspection of the flue and chimney, checking for obstructions. Visually inspect equipment to ensure structural integrity, check all mechanical connections and fasteners for tightness. Visually inspect equipment for body shearing or pinch points. Check bolt torque.

article thumbnail

Total Station in Surveying | Operations of Surveying | Advantage & Disadvantage of Surveying | Types of Surveying | Uses of Surveying

CivilJungle

Reflectorless accuracies aren’t as good as prism accuracies given this variability of the reflecting terrain, and can, therefore, might not be suitable for more accurate surveys like FEMA first floor elevation certifications. Furthermore, fine pointing is aided by having unlimited travel in the tangent screws.