article thumbnail

GHG, SHG, SEC Regulations – Facilities Regs and Reporting Changes Coming Soon

Job Order Contracting

A locally researched, detailed unit price cost database and an associated LEAN, integrated planning, procurement, and project delivery process are both critical to reducing the carbon footprint of facilities and other built infrastructure. Conclusion. The challenge for organizations is developing appropriate leadership and commitment.

article thumbnail

Everything you need for building and project management

Job Order Contracting

Building in Cloud utilizes the benefits of BIM (Building Information Modelling), to increase levels of efficiency and collaboration between team members involved in the design, construction and operational phases of the building life-cycle. This makes it easy to manage assets and components throughout their full life-cycle.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The growing demand for transparency in buildings

Construction Specifier

This includes building controls, lighting, electrical and digital infrastructure, audio/visual (A/V), and other aspects of the structure. The demand for high-performance building controls, lighting, electrical, and digital infrastructure is rising. Environmental and material health impact of building materials.

article thumbnail

King County Mandates its Green Building be the Greenest, with a Twist

Green Building Law Update

In 2005, Ordinance 15118 required all new County projects with budgets over $250,000 seek the highest LEED certification “that is cost effective based on life cycle cost analysis” and the limits of available funding. ” That law was set to expire on December 31, 2013.

Green 120
article thumbnail

Job Order Contracting Done Right! Open, Best Value, Efficient

Job Order Contracting

Initial and ongoing training and certification. LEAN collaborative construction delivery, throughout a structures life-cycle, from concept through demolition/recycling, applied leveraging best management practices, a standardized/common “language”, and tools. Line item modifiers are also presented to further enhance data value.

Contract 100
article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. Finally, complementing and adding the information is in the life-cycle physical asset model is simplified using a CDE. The Designer”.

article thumbnail

Joint public-private sector effort needed to mitigate the construction sector’s embodied carbon problem

BD+C

used Kingspan’s KarrierPanel in the building’s rainscreen to achieve a high R-value and reduced energy consumption toward a goal of LEED certification. Every phase of the construction project life cycle presents contractors with opportunities help lower embodied carbon. The CODE Building in Charlottesville, Va.,