Remove Change Orders Remove Design Remove Documentation Remove Subcontracting
article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Using these granular elements and sharing the associated descriptions, l abor, material, and equipement details in a standardized format (CSI MasterFormat) with all project participants within a robust collaborative process is the path to significant cost savings and the mitigation of change orders, disputes, and waste.

Travel 177
article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders… possible? Design-Bid-Build. Traditional design-bid-build (DBB) delivery process with design, bidding, and construction in separate, sequential steps.

Design 130
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Mayer Building Company for Subcontractors: Payment Guide & Resources

Levelset

In short, the company has a wealth of experience in preserving New Orleans’ historic architecture, as well as designing, building, and renovating commercial spaces. . Read a sample subcontract. These documents are typical for most GCs, and any additional documentation will be requested by a project manager at Mayer Building Company. .

article thumbnail

5 Types of Subcontractor Software Transforming the Trades 

Autodesk Construction Cloud

Subcontracting is a time-honored tradition. They must coordinate some of the most complex aspects of the built environment, with ever up-to-date documents, or face the consequences. Every project has thousands of moving parts; from documents and processes to individual team members. 2: Change Management Software.

Software 105
article thumbnail

IDIQ Construction Contract Guide

Job Order Contracting

Job Order Contracting (JOC) – for the numerous renovation, repair, sustainability, and minor new construction projects, averaging $50,000-$100,000+ up several million dollars bases upon project complexity and associated design requirements. No ability to subcontract—limited to trade specified in the contract. T and M Basics. •

Contract 100
article thumbnail

Sage Intacct Construction Brings Financial Management to the Cloud

Construction Junkie

As the name also suggests, Sage Intacct Construction was designed with the construction industry specifically in mind, and includes functionality and reporting tools that are unique to the industry. Reports within the dashboard have many different configurations to meet your needs.

Sage 145
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. JOB ORDER CONTRACT (JOC) EXECUTION GUIDE. Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100