Remove Compensation Remove Design Remove Negotiation Remove Office
article thumbnail

December 2014 newsletter

FDR Safety

During those 15 days, you may go to your local OSHA office to request an informal settlement conference, during which you can often achieve a reduction in the assessed penalty or a modification of the abatement date, or even a withdrawal or reclassification of the alleged violation. Workers Compensation support. Vendor assistance.

OSHA 120
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

administration of the Job Order Contract (JOC), a Contract designed to provide the ORGANIZATION NAME with a flexible and responsive contractual capability in support of their renovation, repair, and minor new construction services needs. Field Office Expense. Field Office Personnel. Main Office Expense. DEFINITIONS.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Women’s History Month: Pursuing Gender Equality in the Workplace

Stok

In fact, our desire for equitability was one of the primary motivators behind designing our own org structure and pursuing the JUST Label and B Corp Certification. In our increasingly digitized world, there isn’t as strong a need for people to come into the office every day, so why require it? Transparent compensation process.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Minimum Design. Typically, minimum design for SABER is up to 35%. The contractor manages projects from an office, or in close proximity to the base since the relationship is long-term.

article thumbnail

Environmental Regulations in Construction: What Contractors Need to Know

Levelset

This law is administered by the Council on Environmental Quality (CEQ), an executive office of the President. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A construction company that is considered a PRP will need to negotiate a settlement agreement with the EPA. Catellus Development Corp. ,

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Best practice Job Order Contracts typically rely upon the Owner’s existing construction design specifications, and the UPB. A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Specifications. Job Orders / Task Orders.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs. These costs include such things as office space, office staff, operating facilites, etc. Construction cost - the total cost to construct a project.