Remove Denver Remove Design Remove Documentation Remove Drawings
article thumbnail

Dennis Calvert, the right architect for Design-Build

The Korte Company

Design-Build was not always accepted in the industry. So when he encountered Ralph Korte’s vision of Design-Build in action, he saw the industry’s future. . In grade school, Dennis’s art teacher noted his ability to draw and suggested he consider a career in art. There Dennis learned about “on-site design” from Jack Goldman.

Design 52
article thumbnail

Show Village 2021: 3 Idea Homes for the Way We Live Now

Pro Builder

Working, learning, and trying to stay fit from home became a necessity for most, challenging not only long-held habits but also our patience. ( “Homes weren’t designed for us to live in them 24 hours a day. We don’t work well like that,” says architect Dan Swift of BSB Design.) Rendering: RM Design Studio. The New New Home.

IDEA 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Housing, Industrialized: Designing for Off-Site

Pro Builder

Understanding the capabilities of the factory allowed us to meet the attainability goals for the project,” says White, director of design at Dahlin Group , in Irvine, Calif. And losing that 1 foot didn’t affect the livability or marketability of the homes at all.” Not so in a factory.

Site 92
article thumbnail

4 distribution center projects that changed The Korte Company forever

The Korte Company

What pushed The Korte Company from being a modest regional builder into a proper national Design-Build construction company? I’ve got documents and drawings that I’ll overnight you. He ordered the design team to turn everything around. He confirmed that Dennis’s design change wouldn’t blow the budget. At 8 a.m.

article thumbnail

Autodesk Construction Champions 2023: 25 People Powering the Future of Construction 

Autodesk Construction Cloud

From design and VDC professionals to business and project managers, these construction leaders aren't just building structures and facilities—they're shaping our world. As we know, construction teams go through a lot of paper—much of that is used to print drawings, mark up documents, and the like.

article thumbnail

Precut Framing Field Test: Does This Off-Site Solution Earn Its Keep?

Pro Builder

are bundled by wall assembly, with letters printed on each stick matching identical labels on the construction drawings. Ready-Frame suits nearly any home design. We also documented saw time and the number of people on site. Ready-Frame makes sense to framers and builders. Precut studs, plates, headers, etc., Field Study Scope.

Site 98
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

Cory Benjamin , 39, Project Director, BIM Manager, TK Design & Associates, South Lyon, Mich. Koby Bowen , 38, President / CEO of Construction and Design, Homes of Distinction, Rogers, Ark. Alexa Drees Walker , 31, Design Center Director, Drees Homes, Fort Mitchell, Ky. Horton, Denver. TK Design & Associates.