Remove Design Remove Documentation Remove Inspections Remove Schedule
article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

The most important step to take before an OSHA inspection even takes place is selecting a company representative. The company representative is the individual charged with representing the company’s interests during an OSHA inspection. Determining the type of inspection being conducted and the intended scope.

OSHA 156
article thumbnail

Typical JOC Process

Job Order Contracting

Regular Updates and Inspections. Final Inspection. Visit the jobsite and document conditions. Determine if design services are required. Determine project schedule and major milestones. Construction Performed. Warranty Period. Establish project goals. Define building systems and quality of materials.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

Integrated Project Delivery Software and Support Services

Job Order Contracting

Integrated Procurement, Design, and Construction REQUIRES Direct Owner Involvement and Leadership from Predesign Through Closeout and Beyond: Planning and performance management collaboratively and at a systemic level. Common Data Environment.

Software 150
article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Manufacturer’s schedule for routine preventive maintenance, inspections, condition monitoring (predictive tests) and adjustments required to ensure proper and economical operation and to minimize repairs. Installed model and features of each system. Provide instructions stating when the systems should be retested.

Equipment 227
article thumbnail

Cost effective FSRM Facilities Facilities Sustainment, Restoration, and Modernization

Job Order Contracting

Facilities Lifecycle management entails the Planning, Programming, Design, Construction, Activation, Operation, Sustainment, Maintenance, and Disposal of the built environment through Military Construction and O&M-funded SRM activities. The restoration of real property to such a condition that it may be used for its designated purpose.

article thumbnail

Construction project management 101 – Checklist

Lets Build

Managing complex data in intersecting tasks and teams include confirming a project’s justification, developing project schedules and goals, maintaining commitments for a project, holding people accountable, and avoiding common project pitfalls. The PMP also archives baselines for scope, cost, and schedule. The process.