Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

Mike White , Director of Design and Construction at North Point Hospitality (NPH) , is one individual who possesses these traits and abilities. I initially started at North Point, managing projects, then moved to Senior Project Manager and ultimately the Director of Design and Construction. I'll start at the beginning—my family.

Design 80
article thumbnail

Construction Project Scheduling

Construction Cost Estimating

In simple words, a project schedule is a kind of document that gathers all the important works so that project can be delivered on time. Besides that, it also provides automated email alerts so that team members can be aware about their scheduled tasks’ time and manager will know when someone’s availability has changed.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some vital construction documents for a construction project

Construction Cost Estimating

If it is required to develop a new building or refurbish surviving property, the owner should have arranged a document so that the work & other portions of the construction project can be performed systematically. In the design and construction part, various types of construction documents are utilized.

article thumbnail

How to Connect Your Entire Project Team

Viewpoint Construction Technology

The good news, though, is that more and more contractors are looking for ways to improve productivity with technology, and many are seeing quite a bit of success. Construction organizations are relying on modern software for accounting, field management, project management, bid management, design and more.

Viewpoint 184
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

Project Foundation Pt. 1: Building the Master Schedule

Stok

That foundation is a detailed schedule and budget, created and owned by the Project Manager, with input from consultants and contractors, and approved by the Client. To start, here are key considerations to take when creating the Master Schedule, prioritized by stok’s Project Managers : 1. This consideration is too often overlooked.

article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. times the standard deviation; and 2) 0.80 times the characteristic strength ; and the average strength of all the samples is not less than the characteristic strength plus times the standard deviation.

Concrete 229