Remove Documentation Remove Insurance Remove Overhead Remove Permits
article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

f) “Job order contractor” – a licensed, bonded, and general liability insured contractor awarded a job order contract. (g) The proposal may also contain approved drawings, work schedule, permits, or other documentation as the organization may require for a specific job order.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Construction documents help keep your projects organized and guide the construction process from start to finish. Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. .

article thumbnail

Job Order Contracting Glossary

Building Information Management

The document may be referenced in the job order contract and may/or may not be directly provided by the creator of the unit price book and/or job order contract software. “Job order contractor” – A licensed, bonded, and general liability insured contractor awarded a job order contract. Also called Unit Price Guide, UPG).

article thumbnail

Common Types of Construction Contracts And Their Use

cnstrctr

A construction contract is a document that outlines the roles and responsibilities between two or more parties on a project. It is a legally binding document that the groups agree to at the start of a project and are held accountable to throughout. The contract would be solely based on those documents and the scope of work.

article thumbnail

Construction Cost Estimating Blog: How to prepare a bid estimate to.

Construction Cost Estimating

The company who is calling for the bid should render all of these documents. Review the project specifications for getting most sets of construction documents. Put material and labor costs together and comprise any special fees like permits, wage scale, bonds, insurance premiums or other costs.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. The contractor is responsible for submitting documentation that substantiates the proposed approach.