Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods, qualifications, assumptions, inclusions, and exclusions. Bill of quantities (BOQ) - a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. May also be called pricing.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOB ORDER CONTRACT Glossary / Terms / Defintions – JOC , JOB ORDER CONTRACTING

Building Information Management

A selection process dependent upon multiple parameters of past performance, previous experience, references, and price. to 1.20 multiplier applied to the the total of the line items for a project or task order estimate. It typcially includes all overhead items such as. CONTRACT AND CONTRACT DOCUMENTS.

article thumbnail

What are Independent Government Estimates – IGEs?

Building Information Management

This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit.

article thumbnail

Developing a Job Order Contracting Program

Building Information Management

The article introduces the Center for Job Order Contracting Excellence (CJE) and the first documented performance of JOCs. Construction tasks not included in the unit price book may be negotiated. To set the level of performance requirement based on documented performance of contractors by using a relative performance.

article thumbnail

Development of the Job Order Contracting (JOC) Process for the 21st Century

Building Information Management

The JOC Paper introduces the Center for Job Order Contracting Excellence (CJE) and the first documented performance of JOCs. Construction tasks not included in the unit price book may be negotiated. To set the level of performance requirement based on documented performance of contractors by using a relative performance.

article thumbnail

Job Order Contracting – 2015

Building Information Management

If a task is not in the UPB, it can be negotiated, priced and added at any time to the book. The latter is typically referred to as a non-prepriced (NPP) line item. Low overhead cost of construction procurement and delivery. Sample JOC Process: Figure Below. Advantages.