article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Development planning is crucial in managing & implementation of construction projects since it involves selecting the technology, recognizing feasible workflows & estimating specified resources. Step 2: Draft a Preliminary Plan: Utilization of S.M.A.R.T. & Draft an initial plan: Use the S.M.A.R.T. & C.L.E.A.R.

Plans 52
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

The main foremost heading and line items are to be checked properly with respect to the entire project. In some cases, soil testing by a civil, geotechnical, or soils engineer is better to assist formulate a feasible arrange. If you wish them enclosed in your main trade bid, solicit bids as a separate point.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

With the completion in late May of Reach D (part of the Delaware River’s main shipping channel) in Delaware, the Delaware River Main Channel Deepening Project is now about 60 percent complete. The Delaware River Main-Channel Deepening Project is being performed by the U.S. That work is expected to begin in September.

article thumbnail

All About Tendering | What Is Tendering | What Is a Tender in Construction | Tendering Meaning in Construction

CivilJungle

A tender will be a draft legal paper in which a particular act will notify official documents and discharge the capable artisan interested in filling it and taking the project. It is because the users can choose from a big pond of the feasible provider who can carry the best amount of products at a low price.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check voltages on the main board or backplane of the panel as applicable per manufacturer’s specifications. Before calibrating or adjusting pneumatic controls, adjust the pressure of the main control air supplying pneumatic sensors, thermostats, and controllers to manufacturer’s specifications. Check physical condition of the device.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. ” For more information, please visit this link.

Income 108