article thumbnail

Ignoring water issues can harm the economy - Contractor Magazine

Contractor Magazine

Fleet Management. Management Best Practices. Project Management. Home > Management > Business Devlopment > Ignoring water issues can harm the economy. A cooling tower might save 3 cents to 5 cents per ton-hour over an air-cooled system, but the water and sewer costs may be 6 cents. Storage Equipment.

article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

SITE PREPARATION The first 3 things listed – Demolition, Jacking & Shoring, and dirt management area unit scheduled for reworking comes. ON-SITE WATER AND SEWER To begin with, we have budgetary sheets. In many southern regions, chemical treatment of the soil, or alternative treatments, is required by code for termite management.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

If the insulation is known or suspected to contain asbestos, check the building’s asbestos management plan to see it has been tested for asbestos. Manage asbestos in accordance with the plan. Manhole, Sewer. Application: This standard applies to manholes which contain sanitary sewer lines or other related piping systems.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 42 23 Proposal Form – Construction Management (Single-Prime Contract). 00 42 26 Proposal Form – Construction Management (Multiple-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 42 23 Proposal Form – Construction Management (Single-Prime Contract). 00 42 26 Proposal Form – Construction Management (Multiple-Prime Contract).

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CAD: Cadmium, Computer-Aided Drafting. CISP: Cast Iron Soil/sewer Pipe. C: Courses, Curb, Channel, Degrees Celsius, Clock Outlet, Calcimine. C/C: Center to Center. C TO C: Center to Center. CA: Compressed Air. CAB: Cabinet. CAIS: Caisson. CAP: Capacity. CAR: Carpet. CARP: Carpenter. CAT: Catalog. CAV: Cavity. CBL: Concrete Block.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CAD: Cadmium, Computer-Aided Drafting. CISP: Cast Iron Soil/sewer Pipe. C: Courses, Curb, Channel, Degrees Celsius, Clock Outlet, Calcimine. C/C: Center to Center. C TO C: Center to Center. CA: Compressed Air. CAB: Cabinet. CAIS: Caisson. CAP: Capacity. CAR: Carpet. CARP: Carpenter. CAT: Catalog. CAV: Cavity. CBL: Concrete Block.