Remove Drawings Remove Insurance Remove Overhead Remove Security
article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Architectural drawings. Certificates of insurance. Insurance . 5: Drawings. Construction documents often include architectural drawings. Overhead costs. These documents essentially cover the full range of your business operations from the beginning of a project until the end. . Work orders. Safety reports.

article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

They also include overhead costs such as insurance, mileage, a portion of your office rent. Designers also have more input in the construction drawing process, reducing the need for changes. . The GMP includes costs for labor, materials, overhead, and a percentage of those costs to generate a profit. That’s the “plus.” .

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. authorization. Job Conditions.

Contract 100
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Just the bare labor component includes adders such as fringe benefits, unemployment insurances (federal and state), social security taxes, public liability costs, and builders risk insurance.

article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). The minimum guarantee need not be the same amount that was used to secure the work of the basic contract.

Contract 100
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Coefficients may include bands or ranges based on dollar levels, standard and non-standard hours, range or isolated site work, or work in secured areas. Detailed scope of work; and.

article thumbnail

Rory Woolsey's Construction Estimating Blog: The Estimating.

Rory Woolsey

The realities of the site such as weather, on-going operations, soils conditions, access/ egress, security, safety, site lay-out, environment protections and other context scope must be considered as well as the means and methods that the work will be executed. These all impact the overall cost of the project.