Remove Electrical Remove Feasibility Remove Leases Remove Maine
article thumbnail

Top 5 Construction Strategies to Consider Before Purchasing an Underperforming Shopping Mall

HardHatChat

Perhaps the most important aspect in this process will be engaging a national retail commercial contractor for advice and feasibility studies. It’s best to know the status and potential lifespan of main mechanical, electrical and HVAC systems. It would be a waste to purchase a shopping mall only to see top tenants leave.

Retail 253
article thumbnail

Top 10 Companies for Environmental Engineers to Work For

CivilJungle

Our services include spare parts supply, and build-own-operate (BOO) and maintenance contracts, technical audits, leased water treatment systems, technical training, and remote monitoring. Paramount also provides consultancy services in Air Quality Monitoring, Environmental Impact Assessments and Treatability & Feasibility Studies.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

At least 65 percent of these funds will be provided for expansion of the Computer Science Division of the School of Electrical Engineering and Computer Science at LSU. The riverfront complex is being built on the old Advocate newspaper site bordered by Main, North, Lafayette Street and River Road. The approximately $30.5

Metro 110
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. Small Producer Credit (AS 43.55.024(c)): Credit of up to $12 million per year for taxpayers incurring eligible oil and gas lease expenditures in North Slope operations.

Income 108
article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

The P3 project is a 50-year agreement between the Maryland Port Administration (MPA) and Ports America Chesapeake to lease and operate the 200-acre Seagirt Marine Terminal. Each crane weighs 1,550 tons and is fully electric so it emits no diesel emissions. The Delaware River Main-Channel Deepening Project is being performed by the U.S.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. The program offers the following incentives: Transaction Privilege Tax Exemption (TPT Exemption) on purchased qualifying equipment and leased or rented qualifying equipment. TAX EXEMPTIONS.

Income 75