article thumbnail

Ready mix concrete life cycle

GCP Applied Technologies

Ready mix concrete life cycle. That’s why tilt-up construction is one of the fastest growing construction methods in the US, with at least 10,000 buildings constructed each year. Many warehouses, including Amazon’s, were built using this process. Ready mix concrete life cycle. michael.delros…. return to top.

article thumbnail

UK BIM has same issue as US BIM

Job Order Contracting

Like the US, the UK remains mired in ‘ad hoc’ silo-based construction and facilities management processes. The post UK BIM has same issue as US BIM appeared first on 4BT. The UK BIM Level 2 requirement went into effect 4th April 2016 and little has changed.

BIM 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top Ten Considerations for a Business Strategy for The Life-cycle Management of the Built Environment – BLM, LMB

Building Information Management

Current Business Environment – Deconstruction of the AECOO Sector (Architecture, Engineering, Construction, Operations, Owner). Life-cycle Cost vs. First-Cost Focus. Business strategy is driven by our environment and associated demands and fundamental change is upon all of us. Falling Transaction Costs.

article thumbnail

Life-cycle management of the built environment – To BIM or Not to BIM?

Building Information Management

Buildings, roads, dams, electrical grids… are with us for a very long time and linked to the success and failure of just about everything… education, health, national security, transportation, habitat, sustainability, national and local economies and more. That said, we are not acting as stakeholders of our built infrastructure.

article thumbnail

Construction is NOT complex…. People are. Successful Construction Project Delivery Requirements

Job Order Contracting

IMPROVE Construction Cost Control Improve cost control by using common core information, including a locally researched detail unit price database. Early and ongoing communication of scope of work requirements using detailed tasks within a collaborative environment optimized planning, procurement, and project delivery.

article thumbnail

Solving Facilities Repair, Reno, New Build Knowledge Problems, Process Problems, Data Problems, and Management Problems

Job Order Contracting

Significant opportunities and benefits are available to any real property owner willing to address the ever-present challenges associated with facilities life-cycle management and the myriad of ongoing repair, renovation, maintenance, and new builds. Continuous improve as team members build and maintain knowledge.

article thumbnail

Essential BIM Terminology

Viewpoint Construction Technology

Data and documents are shared via a common data environment. Common Data Environment (CDE). The common data environment is one location holding all the information for a specific project. It is used to collect and manage all relevant documents for all stakeholders to access at any time. Life-Cycle Assessment.

BIM 139