Remove Life Cycle Remove Modeling Remove Presentations Remove Visualization
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Correspondence: abdullateef.olanrewaju@ymail.com. INTRODUCTION.

article thumbnail

Why You Should Make 4D Construction Sequencing ‘Business as Usual’ – and How To Do It

Autodesk Construction Cloud

You create fancy animations and visualisations of the built assets coming to life, ultimately presenting a relatively low-fidelity model of the asset you’re creating. It provides a robust maintenance and management tool and ensures that the asset's life cycle is streamlined and sustainable.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM Basics 2014 – Building Information Modeling, Models, and Management

Building Information Management

BIM is the life-cycle management of the built environment supported by technology. Uncategorized 2014 and Managment basics BIM building information modeling job order constracting job order contact Models TCO total cost of ownership' As such, its ultimate purpose is to manage total cost of ownership (TCO).

article thumbnail

BIM ( Building Information Modeling ), Cloud-computing, Changement Management, and Architecture, Engineering, and Construction – III

Building Information Management

Cloud-computing will have a much more significant impact upon how the built environment is managed than 3D visualization. BIM is the life-cycle management of the built environment support by digital technology. BIM is the life-cycle management of the built environment support by digital technology.

BIM 66
article thumbnail

How ITC Reduces Construction Disruptions and Delays With Digital Transformation

Autodesk Construction Cloud

On top of the challenges presented by relying on 2D design and pre-construction drawings on AutoCAD , ITC’s biggest challenge was improving the visualisation of projects from the first step to the final product. Automated quantity take-off of MEP elements from BIM model. “We Visualized complete project in 3D.

article thumbnail

The “I” in BIM, OMNICLASS, and the Criticality of Getting it RIGHT…. Now!

Building Information Management

In order to efficiently manage the life-cycle of the build environment, robust process, terms, and decision support tools are required that deal with physical and functional conditions, costs, priorities, risks, etc. Yet, the capability is NOT present at this time. Here’s a short list of what is holding us back.

article thumbnail

The Problem with the UK’s BIM Strategy

Building Information Management

”(Source: 2015, Level 3 Building Information Modelling – Strategic Plan, HM Government). where BIM has stagnated due to an unfortunate focus upon 3D visualization versus building awareness and competency with respect to LEAN collaborative AEC/construction delivery methods. Deliver geotechnical capabilities.

BIM 58