Remove Negotiation Remove Overhead Remove Procurement Remove Site
article thumbnail

Persimmon targets subcontractors in cost-cutting drive

Construction Enquirer

We are actively retendering sites to identify savings. ” Persimmon is also focusing on value-engineering with a “plot-by-plot, site-by-site review to identify areas for cost savings or value enhancement that do not compromise quality.”

article thumbnail

Consistent Delivery of On-time, On-Budget, Quality Renovation, Repair, and Construction

Job Order Contracting

Best Value Procurement Competitively Bid. defining scope, joint site visits, ordering projects, proposal requirements and formats, timelines, auditing/reporting… Use Owner’s Existing Technical Specifications (if not available, create using commercially acceptable standards modified to owner requirements).

Budgeting 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). The ORGANIZATION NAME Procurement Authority will authorize a Job Order (JO) for performance of work, or request additional information/changes. The UPB costs should NOT include contractor overhead and profit. UPB rate and the Contractor’s multiplier. Field Office Expense.

Contract 100
article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

But that’s not all, the DoD doesn’t leverage current system thinking and robust, integrated planning, procurement, and project delivery workflows to maximize utilization of resource. The contracting officer shall negotiate the modification and make a determination that the price is fair and reasonable. (d) c) Limitations.

Contract 226
article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). the JOC contractor formally accepts the order, as mutually agreed, with real property owner. (e) Solicitation. (a)

Contract 100
article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

County, State, and Local Governments, include secondary education unfortunately continue to use JOC simply as a means to speed delivery and bypass traditional procurement versus as a LEAN collaborative construction delivery method. Selection of Architects and Engineers statute procedures must not be used for evaluation or award of JOC.). (d)

Contract 100
article thumbnail

Developing a Job Order Contracting Program

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. JOC is used in nearly every US military site in the world. A minimum and maximum amount of work per year per site. Introduction. Enhanced quality control.