article thumbnail

Schedule LOD’s – Levels of Detail for Construction Schedules

Building Information Management

Jelen’s Schedule Levels. Functionally there is very little practical application for a schedule that is only a single bar other than to represent an element of a project or program time line. Level zero schedules normally will include the project or program major milestones and bars indicating key scope. Schedule Level.

article thumbnail

Revit OpEd: Electrical Panel Load Calculations

Revit OpEd

Electrical Panel Load Calculations. If you are a Revit MEP user and electrical is your game, then youll want to read it. of Echo , Electrical , Panel Reports. Panel Schedule and Load Calculation Addition. Electrical Panel Load Calculations. ► 2004. (2). ► December 2004. (1). at 10:19 AM.

Revit 53
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. Labels: Calculations , Electrical , Revit MEP. Panel Schedule and Load Calculation Addition. Electrical Panel Load Calculations. ► 2004. (2). ► December 2004. (1). ► November 2004. (1). Revit OpEd. Wednesday, July 25, 2012. at 8:00 AM.

Revit 53
article thumbnail

SEO and PPC Best Practices Webcast

Construction Marketing

The free webcast for members and non-members is scheduled for Thursday, November 17, 2011 at 1 pm CST. Jo holds a master’s degree in accounting and an undergraduate degree in business administration from the University of Texas at Austin, where she graduated magna cum laude in 2004.

Illinois 238
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 01 20 List of Schedules. 00 31 13 Preliminary Schedules.

article thumbnail

Revit OpEd: Revit 2013 - Content Folders

Revit OpEd

That was done purposely so they dont show up in door or window category schedules. Revit MEP users are used to all the electrical content being located under a single folder and then broken down by usage. Now well find Electrical and Lighting and these are further broken down by Architectural and MEP. ► 2004. (2).

Revit 53
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 01 20 List of Schedules. 00 31 13 Preliminary Schedules.