Remove 2007 Remove BIM Remove Modeling Remove Schedule
article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Rooms and areas can be deleted in model views like floor plans and ceiling plans. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. Whadya think?

Revit 56
article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

Kitchen Equipment - RW Smith BIM Booklet. The company recently finished up their BIM Services booklet hosted by Issuu. I can see why, polished presentation as well as high quality modeling work. Labels: BIM , content , Contractor , Plugs , Vendor. Blog Listing - BIM and Misc. Delete Sheets In Browser or Schedules.

Revit 71
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. This is more pronounced if the structural slab is in the structure model only. The issue is the same when interior walls are linked into a shell model.

Revit 53
article thumbnail

Revit OpEd: RTCUSA - Cannon Contest - I Heart BIM

Revit OpEd

RTCUSA - Cannon Contest - I Heart BIM. The entries have to submit 100 words about why they love BIM. I Love BIM" awwww. Its a heart modeled in Revit. Blog Listing - BIM and Misc. RTCUSA - Cannon Contest - I Heart BIM. Scheduling Inequity for Ducts. ► 2007. (77). ► December 2007. (1).

Revit 58
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Symposium Title: Integrating BIM: Moving the Industry Forward. Friday: BIM Academic Education Symposium. Day(s)/Date(s): January 7-11, 2013.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Symposium Title: Integrating BIM: Moving the Industry Forward. Friday: BIM Academic Education Symposium. Day(s)/Date(s): January 7-11, 2013.

BIM 40
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. The value management approach reduces the risk of project failure, lower cost, shorten projects schedules, improve quality, functions, performance and ensure high reliability and safety.