Remove Airports Remove Documentation Remove Risk Remove Safety
article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage RiskĀ 

Autodesk Construction Cloud

And with good reason: the right insights can improve everything from project cost and timeline accuracy to reducing the risk of lawsuits and disputes, and even winning more business. An example of a data point might be the number of overhead mechanical racks installed on the job that day, or logging the root cause of a safety incident.

Risk 52
article thumbnail

Safety Hazard on Construction Projects

The Constructor

This leads to the presentation of an Information Technology IT tool for construction project safety management Total-Safety and, in particular, a module within Total-Safety designed to help construction personnel develop method statements with improved levels of hazard identification.

Safety 114
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Silver Line Metrorail project leading to the Dulles International Airport. Sometimes, the project won’t pass inspection, or it will need to be torn down due to safety and health concerns. 2: Thoroughly Document Mistakes. If possible, make sure to document the mistake visually with photos.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? All rights reserved.

America 203
article thumbnail

Construction Collaboration Requires Common Terms

Job Order Contracting

Examples: buildings, roadways, dams, bridges, utilities, mass transit, airports, equipment. audit: systematic, independent documented, and verifiable process for obtaining evidence and evaluating it objectively to determine the extent to which the a product or service is providing intended results and/or meeting requirements.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Team members monitor and control progress in terms of cost, time, and quality; and manage risk. Executing the project: In this phase of the project, team is ready to launch the project. If the project work is not carried out as per schedules, and execution is well behind the schedule, then cost and quality of the project will be effected.

article thumbnail

TEMPERATURE EFFECTS ON CONCRETE

The Constructor

Knowledge of the magnitude of the thermal movement is necessary to evaluate the risk of thermal cracking in situations where large thermal gradients are likely to occur, and to calculate dimensional changes in structures such as bridge decks. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

Concrete 194