RESIDENTIAL BUILDING SITE PLANNING

The Constructor

The requirements of site for buildings with different occupancies are different. So all the buildings proposed for different purposes have different requirements and thus different considerations for their site selection. The site should be in fully developed area or in the area which has potential of development.

article thumbnail

CONSTRUCTION SITE PLANNING

The Constructor

The opportunities and constraints inherent to a site and the response to a program/design brief are analysed and documented in an overall site planning document that should accompany a development application. Undertaking a rigorous site analysis therefore must be one the first steps in addressing the controls set out.

Site 118
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Federal, State, County, and Local Government, as well as Education, Healthcare and Transportation Departments and Agencies have a responsibility to create cost visibility and cost transparency and drive improved construction productivity.

article thumbnail

FACTORS CONSIDERED FOR CONSTRUCTION PROJECT

The Constructor

Factors that affect construction project Site selection is mainly based on two factors: 1. Aim should be to reduce the consumption of energy resources and still create an efficient structure. Factors concerning before construction of the project 2.

article thumbnail

BUSINESS REPORT: Tennessee Initiates Site Certification Program

Buisness Facilities Contributed Content

In June, the Tennessee Department of Economic and Community Development (ECD) launched the Select Tennessee Certified Sites Program ( www.selecttennessee.com ), a new, statewide endeavor that assesses, certifies and promotes available sites for relocations and expansions. Each aspect has its own purpose and meaning.

article thumbnail

PRECAST CONCRETE PROCESS

The Constructor

The individual components are prefabricated off site then taken to site where they are erected. Transport to site: The components are delivered to site in a pre-determined sequence to ensure that hardened concrete are ready for instant erection. Erection at site: The components are erected straight from the lorry.

Concrete 143
article thumbnail

COVER STORY: Shovel Ready Sites Are Growing From The Ground Up

Buisness Facilities Contributed Content

are implementing site certification programs called “shovel ready”—meaning that the site is primed and ready for economic development. Certified shovel ready sites are in growing demand among companies and site selection consultants, and they are an increasingly popular tool for communities to attract new business and industry.

Site 49