Three Easy Steps to Building a Commercial Building

Wolgast Corporation

Three-Phases to Design-Build Construction: Preliminary Design and Estimating Detailed Construction Drawings and Bidding Construction Step One/Phase I – Preliminary Design and Estimating In this First Step or Phase our Architect develops plans based on a needs analysis meeting with the building owner and representatives for a nominal fee.

article thumbnail

What’s in a JOC Coefficient

Job Order Contracting

Compliance with environmental laws (overhead [indirect] costs associated with performing work in compliance with EPA/OSHA regulations, including obtaining any necessary licenses and permits, reporting requirements, etc.). As built drawings. Permits, licenses, and fees. Permits, licenses, and fees. Quality control.

Overhead 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC TASK ORDER Process Overview – USACE

Job Order Contracting

A detailed line item, and preferably locally researched (no use of cost factors) is used by the JOC contractor to prepare a propsal/bid for review by the USACE. The government will not provide the contractor with detailed Task Order drawings for projects that do not require a design.

article thumbnail

The Preconstruction Phase: Understanding the Process & Risks

Levelset

An architect, designer, or design-bid contractor will perform planning and engineering services for a prospective project owner, providing them with the information they need to move forward. With a clearly defined scope, the GC can pre-qualify subs and reach out to them for bids and quotes. Bidding/procurement.

Risk 52
article thumbnail

How to Create a Successful Restaurant Construction Schedule

HardHatChat

How prepared and organized the owner/operator is in terms of having drawings done and hard delivery dates on the FF&E (fixtures, furnishings and equipment). Design process – this is where the architect creates drawings (typically 4-6 weeks). Permit process – this could take up to 3 months depending on your location.

Schedule 258
article thumbnail

Understanding the Contractor’s Job Order Contract Coefficient

Job Order Contracting

Compliance with environmental laws (overhead {indirect} costs associated with performing work in compliance with EPA/OSHA regulations, including obtaining any necessary licenses and permits, reporting requirements, etc.). As built drawings. Permits, licenses and fees. Compliance with protection and safety laws (i.e.,

Contract 100
article thumbnail

Construction Cost Estimating Blog: How to prepare a bid estimate to.

Construction Cost Estimating

How to prepare a bid estimate to win a project. A bid process is required to award the most jobs in construction industry. In a bidding contest the lowest bidder will be awarded the contract. Estimating a construction bid involve some knowledge of the building process. Review the drawing and floor plans.