Remove CAD Remove Compensation Remove Modeling Remove Schedule
article thumbnail

BIM IP

Building Information Management

For some reason BIM authors (architects, engineers, etc) think that because they create the initial BIM information they have the right to full control and to charge for the BIM model throughout the life of the building. The architect schedules doors, the hardware supplier adds to that schedule, they don’t create their own.

BIM 40
article thumbnail

20 construction industry trends to watch in 2020

Building Radar

Some software products specialize in scheduling, others in collaboration. Furthermore, forecast models calculate realistic time constraints for project control. Many team players, much data: one cloud for all The magic of Building Information Modeling (BIM) succeeds thanks to the cloud.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Review manufacturer’s instructions.

article thumbnail

AutoCAD vs. ABS vs. Revit Systems

CAD Shack

Some of you may be too young to remember life before cable, but I bet most can remember a time when your choice of CAD technologies was limited to one. These properties allow us to step away from layers for display control and give us a mechanism for linked scheduling of any object type. A Revit project has only one model.

AutoCAD 40