Remove CAD Remove Deals Remove Modeling Remove Visualization
article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality Capture 

Autodesk Construction Cloud

For starters, you’re dealing with an old structure without CAD files and limited documentation. Thanks to lower hardware costs and direct connections between tools, the process of creating usable 3D models from photos or laser scans is easier than ever. A better design and coordination workflow .

Design 119
article thumbnail

The “I” in BIM, OMNICLASS, and the Criticality of Getting it RIGHT…. Now!

Building Information Management

In order to efficiently manage the life-cycle of the build environment, robust process, terms, and decision support tools are required that deal with physical and functional conditions, costs, priorities, risks, etc. Progress towards compiling new abbreviations to submit to the United States National CAD Standard® consensus process.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The lifecycle of a detail – BIM and butterflies

DebunkTheBIM

In the past, I tried to use all sorts of parallels to explain this idea, from the ideas of visual skeletons, to coatracks fixed in space, but I still find myself meeting blank stares when I try sharing this as the ‘BIG secret’. And I mean, everything, getting IFC drawings, as-builts, shop-drawings, or magical, know it all 3-7D (+) models.

BIM 60
article thumbnail

Behind the Build: Interview with Justin Lipsey, VDC Technical Leader, SSOE

Autodesk Construction Cloud

A VDC rotation slot happened to open up, and at that time I didn’t really know a great deal about VDC. We also want to better visualize that kind of information in a palatable way for our users. . Then empower them through the use of data to visualize the end goal. . I just had a very broad idea of what it was. .

BIM 52
article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

Ivana shares how Mace saved 50% of their time spent on coordination and reporting by using BIM 360 Document Management and Model Coordination. Background into integrated methodologies for tracking changes and model coordination review. How to overcome internal resistance around using 3D models for quantity takeoff.

article thumbnail

don't think: Do Revit: The gag order is lifted!! Its 2012 Time!

Do

This years release I would also say has a bent towards addressing issues that large projects (and therefore mostly large firms) have to deal with. Lastly 12 sees the release of new tool subset (currently only available in Architecture and Structure), we now have version 1 of "Construction Modeling" tools. Permission data is cleaned up.

Revit 40
article thumbnail

How long should it take to build a ‘functioning’ BIM team from scratch?

DebunkTheBIM

At the time they were advised by a particular software provider how to get into BIM and that quickly saw them part with enough cash to purchase a dozen of BIM-suites and train a matching dozen of BIM modellers by the same provider. I really don’t mind this at all, she may well be right.

BIM 50