article thumbnail

Best and Worst of 2010: Commercial Construction Trends

HardHatChat

We saw much-improved activity in shopping center construction – not necessarily the building of new malls, but in general commercial contractors working with landlords and developers on pre-construction services , such as commercial construction budgeting to help them propose attractive lease deals for new tenants. High – Franchises.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Preventative maintenance is critical to facilities occupant health and safety, as well as meeting an organization’s fiduciary responsibilities. Check Bollard/Barricade safeties (proximity, Photo, infra red, pressure etc) 7. Check operation of safety edges, stops, electric eye, treadle, or other operating devices.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. indoor environmental quality survey to be administered 18 months after issuance of a certificate of occupancy and repeated every 3 years.

Green 156
article thumbnail

Illinois: Unveiling the Future of Digital Design and Manufacturing

Business Facilities

Richelieu has leased a 115,000-square-foot manufacturing facility, and plans to employ 115 people. million investment in its infrastructure by installing an Engineered Materials Arresting System (EMAS) to its 5,000-foot-long main runway, adding another level of safety that helps reduce injuries and aircraft damage from accidents.

article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. indoor environmental quality survey to be administered 18 months after issuance of a certificate of occupancy and repeated every 3 years.

Green 136
article thumbnail

Global Growth Surge in Southwest Louisiana

Business Facilities

Generally these sites are leased. The public will build to suit and issue bonds for buildings and lease them back to the business. The owners generally are open to the sale or lease of their property and some will consider build to suit options. The public sites include: The two (2) ports and the municipal airport.

article thumbnail

Maryland Adopts 42 New Environmental Laws in 2021

Green Building Law Update

House Bill 1069 requires an owner of a residential rental property that is served by a private water supply well to provide the results of the most recent water quality test when a tenant signs a lease and then for water quality testing every three years and disclose the results to current and prospective tenants. Septic Systems.

Maryland 156