What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

5 Reasons to Use Mechanical Contractor Software

Pro Builder

5 Reasons to Use Mechanical Contractor Software. The construction industry has gone through an extensive transformation, and technology has completely changed the concept of how to drive more quality, productivity, and profit into projects. Here are five reasons to use mechanical contractor software: 1) Drawing & Design Planning.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

But a pay app is actually a collection of supporting documents that first and second tier contractors submit to request payment. The construction contract will typically define the process for submitting a pay app, the documents to include, and the deadline for submission. Contractors get paid for the work they document.

Lien 98
article thumbnail

3 ways to avoid defects in construction

Lets Build

Design defects are a result of the design team failing to produce organised and accurate construction documents. Defects due to omission are typically fixed through change orders that add to the scope of work for one or more contractors. Inefficient document distribution. Store your documents in one place.

article thumbnail

How The Cloud Is Enabling Smarter Project Management—Part 4 of 5

Viewpoint Construction Technology

Often, project managers work with information culled together in reports generated in software systems that cannot pull data until it is fully processed or individual phases of the project are completed. With more and more technologies moving to a true cloud platform it makes it much easier to integrate between software programs.

article thumbnail

Autodesk Construction Cloud Releases 3 New Products: Build, Quantify, & BIM Collaborate

Construction Junkie

At last year’s Autodesk University (AU), the company’s yearly AEC technology conference, Autodesk announced the release of Autodesk Construction Cloud, which unified their in-house and recently acquired construction software under a single unified platform. Users on the app will be able to create RFI, track issues, and view/redline drawings.

Autodesk 110
article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors. Download Candy It is a superb Construction Project Management Software to manage projects efficiently in the construction & engineering industry.

Bidding 40