What Is a Change Order?

Autodesk Construction Cloud

What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

5 Reasons to Use Mechanical Contractor Software

Pro Builder

5 Reasons to Use Mechanical Contractor Software. The construction industry has gone through an extensive transformation, and technology has completely changed the concept of how to drive more quality, productivity, and profit into projects. Here are five reasons to use mechanical contractor software: 1) Drawing & Design Planning.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

But a pay app is actually a collection of supporting documents that first and second tier contractors submit to request payment. The construction contract will typically define the process for submitting a pay app, the documents to include, and the deadline for submission. Contractors get paid for the work they document.

Lien 98
article thumbnail

3 ways to avoid defects in construction

Lets Build

Material defects. Material defects happen when building material gets damaged—whether the defects come straight from the manufacturer or the damage occurs on site. These types of defects can be particularly expensive; it’s not uncommon to only notice material defects after a contractor uses them in the project.

article thumbnail

Why It’s Time for Contractors to Adopt Collaborative BIM

Viewpoint Construction Technology

The JBKnowledge 2017 Construction Technology Report , which covers topics such as software adoption and IT investment, reveals some interesting—and perhaps a little troubling—insights about BIM. Accessible, version-controlled documents —BIM software solutions simplify data management and expand accessibility of documents to the entire team.

BIM 179
article thumbnail

How The Cloud Is Enabling Smarter Project Management—Part 4 of 5

Viewpoint Construction Technology

Often, project managers work with information culled together in reports generated in software systems that cannot pull data until it is fully processed or individual phases of the project are completed. With more and more technologies moving to a true cloud platform it makes it much easier to integrate between software programs.

article thumbnail

What Causes Construction Project Delays?

Viewpoint Construction Technology

Working with cloud-based, integrated construction software can keep everyone on the same page by providing equipment, materials and worker status visibility, project progress and productivity and timeline transparency — all in real time. Accurate estimating ensures there is always enough money for materials, wages, and more.