What Is a Change Order?

Autodesk Construction Cloud

What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

But a pay app is actually a collection of supporting documents that first and second tier contractors submit to request payment. The construction contract will typically define the process for submitting a pay app, the documents to include, and the deadline for submission. Contractors get paid for the work they document.

Lien 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN Job Order Contracting – Getting the most out of available funds

Job Order Contracting

LEAN JOC Programs mitigate change order and/or “supplemental job order” (a fancy term for change orders), as Owners and Design-builders work directly together on an early and ongoing basis to create and agree upon a detailed Scope of Work and associated detailed line-item proposal and approved workorder.

Contract 240
article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Any required documentation and/or forms.

article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Using these granular elements and sharing the associated descriptions, l abor, material, and equipement details in a standardized format (CSI MasterFormat) with all project participants within a robust collaborative process is the path to significant cost savings and the mitigation of change orders, disputes, and waste.

Travel 177
article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Construction Change Order Best Management Practices. Definition of a construction change order: A construction change order is work that is added to or deleted from the originally agreed upon and contracted scope of work which alters the original contract amount and/or completion date. Change Order Impacts.

article thumbnail

Preparing Independent Government Estimates – IGEs , IGCEs

Job Order Contracting

Most Independent Government Cost Estimates are Not Well Documented. The usefulness of an IGE to a contracting officer and other Government interest depends largely upon its supporting documentation. Unfortunately, the process is largely done inappropriately and without cost transparency or visibility, and rarely is verifiable.