article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

THE ESTIMATING PROCESS FROM A TO Z Here in this cover story we are going to present you the basic details of the estimation. First, we have to download the estimating and budgeting spreadsheet. CUSTOMIZING THE ESTIMATING AND BUDGETING WORKSHEET This is an excel format of spreadsheet. A patience read is necessary here.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Analytical comparisons of the two techniques are then presented in section V as discussion. LCC enables a practical economic comparison of the alternatives, in terms of both the present and future costs. BIM is the life-cycle management of the built environment supported by digital technology.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

#104:  Proving Lost Productivity Claims

NH Construction Law

At the bid stage contractors estimate the manhours needed to complete their contracts by anticipating what those conditions will be. Because it requires a comparison of impacted and unimpacted periods of work, “measured mile” methodology on a single project won’t be available if the entire work was impacted from Day One.

Claims 40
article thumbnail

Federal Facilities – Implementation of Energy Savings Projects and Performance-Based Contracting for Energy Savings

Building Information Management

Proven over the past 20+ years and now supported by technology such as RSMeans JOCWorks, and 4Clicks Project Estimator, transparency, higher productivity, and ease-of-implementation are a reality. Learn more: Software , JOC White Paper , A Comparison of Cost Estimation Software Tools. The White House. For Immediate Release.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

In addition to the 800 jobs that will be created at the Baton Rouge facility over the next four years, LSU estimates the project will result in approximately 542 new indirect jobs, for a total of approximately 1,342 new, permanent jobs in the Capital Region. Total investment for the combined development is estimated to be $55 million.

Metro 110
article thumbnail

BUSINESS REPORT: Texas – Innovation Moves Front And Center In Austin

Buisness Facilities Contributed Content

Collectively, SXSW is the highest revenue-producing event for the Austin economy, with an estimated economic impact of $167 million in 2011. The Department of Veterans Affairs estimates there are more than 1.6 Recently, Amazon committed to hire more than a thousand veterans in the U.S. million veterans in the state of Texas. “We

Austin 73
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. After contract award, the time required to estimate, propose, negotiate, and issue TOs for individual projects is four weeks, or less; and. Introduction. Site visit.