article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

Foreign-Trade Zones (FTZs) Program was created in 1934 with the goal of helping businesses in the U.S. According to the National Association of Foreign Trade Zones (NAFTZ), in 2014, goods exported directly from U.S. The value of shipments into zones totaled nearly $660 billion, compared with $798 billion the previous year.

Risk 40
article thumbnail

Radiant Heating Systems

Green Home Design Architect

Electric radiant systems are only cost effective if they have a significant thermal mass such as a concrete floor. This allows you to heat the concrete floor during off-peak electric hours (overnight) and heat the home comfortably for up to 8-10 hours during high-peak electric hours (daytime).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Green Home Building and Sustainable Architecture: Puerto Vallarta.

Natural Building

Puerto Vallarta is on the Pacific coast in the tropical zone of central Mexico, where the climate is generally quite hot and humid. Standard Mexican construction takes this into consideration, using confined masonry techniques with steel-reinforced columns and bond beams that frame the common brick or concrete block construction.

article thumbnail

How to Draw a House Plan Step by Step

CivilJungle

Symbols and Rules: Go for symbols and rules for brick masonry, stone masonry, concrete works, woods, etc after complete dimensioning and name indication ing. Draw floor plans to scale to help draft an accurate representation of how the finished design will look. Research zoning laws. Draft with an architect’s scale.

article thumbnail

Revit Beginners: My Work

Revit Beginners

In this tutorial I have drawn four leves Lines as follows: - Level 1 - Line is drawn at -14 Level 2 - Line is drawn at -10 Level 2 - Line is drawn at 0 Level 2 - Line is drawn at 10 Then I switch to Level 1, I click on Wall Icon in Design Bar & select "Basic Wall Foundation -12" concrete. Marathon Drafting. Revit Zone.

Revit 40
article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

The region boasts one of California’s largest enterprise zones, offering incentives for companies to locate and expand within the greater Sacramento area. Ultimately, ACT selected Sacramento because the availability of a qualified workforce and the benefits of locating in an Enterprise Zone.

article thumbnail

Revit Beginners: Stepped Foundation Plans

Revit Beginners

Duplicate your Basic Wall: Foundation - 12" Concrete for each stem wall and footing size you need. Marathon Drafting. Revit Zone. We often have split level projects and weve had a lot of trouble isolating the stem walls and footings from the rest of the model for use in a foundation plan. that is until Revit 9.0 came along.

Revit 40