article thumbnail

Best Project Highway/Bridge: SR-172 RR Crossing

ENR Construction

More than 15,000 vehicles travel S.R. 172 (5600 West) daily in Utah’s Salt Lake Valley, but an at-grade crossing with the Union Pacific Railroad was creating up to eight hour delays on this two-lane corridor.

article thumbnail

World's Largest Ongoing Construction Projects

Construction Cost Estimating

The construction industry is suffering a slump due to the pandemic, but the giant construction projects all over the world are still ongoing. Here are the top ten ongoing construction projects around the world enumerated below. The whole project is scheduled to be done in 2024.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Highway/Bridge, Excellence in Safety, Award of Merit; I-10, Ina Road Traffic Interchange

ENR Construction

Before the renovations, Ina Road crossed at-grade railroad tracks and then crossed under I-10, which created traffic delays during peak travel periods, primarily due to the busy railway.

Roads 53
article thumbnail

Texas Central Wins Authority to Take Land for High-Speed Rail System

Construction and Infrastructure Law

On June 24, 2022, the Supreme Court of Texas held that Texas Central Railroad & Infrastructure, Inc. Here, Texas Central was created for the purpose of constructing, acquiring, maintaining, or operating lines of electric railway between Texas municipalities. 4] Thus, the demand for easy travel between the two major cities exists.

Texas 98
article thumbnail

Texas Central Wins Authority to Take Land for High-Speed Rail System

Construction and Infrastructure Law

On June 24, 2022, the Supreme Court of Texas held that Texas Central Railroad & Infrastructure, Inc. 2] Here, Texas Central was created for the purpose of constructing, acquiring, maintaining, or operating lines of electric railway between Texas municipalities. Move over luxury bus lines and quick flights. FOOTNOTES [1] Miles v.

Texas 52
article thumbnail

Types of Loads for Design of Bridge Structures

CivilJungle

It is considered the initial computable design load when constructing a bridge design. Also, read: Concreting in Construction | Classification | Properties | Grades | Advantage & Disadvantage | Quality Control. Selecting one vehicle or a group of vehicles to construct a safe bridge is difficult. Superimposed Dead Load.

Design 52
article thumbnail

The importance of crushed stones alongside rail tracks

Construction Cost Estimating

Sleepers can be termed with different names like cross-tie, railroad tie etc. The air voids which exist among the stones take up vibrations and make it at ease for the travelling passengers as well as for the residents next to tracks. • To get rid of weed & plant growth from beneath. • in places where track is fully concreted).