Remove Design Remove Life Cycle Remove Presentations Remove Schedule
article thumbnail

Job Order Contracting Life-cycle Facilities Value Management

Job Order Contracting

Job Order Contracting Life-cycle Facilities Value Management and improving AECOO outcomes for all participants and stakeholders. Job Order Contracting Life-cycle Facilities Value Management enables the efficient use of available funds targeted for executing renovation, repair, maintenance, and minor new construction projects.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

For example, GAO and other studies/reports consistently report that errors and lack of due diligence with respect to original construction cost estimates are primary reasons for negative cost and schedule impacts, and overall poor project performance and outcomes. T The following figure, for example, was produced in 1972.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Correspondence: abdullateef.olanrewaju@ymail.com. INTRODUCTION.

article thumbnail

Collaboration in Construction Matters

Job Order Contracting

Compare those numbers to the AECOO (architecture, engineering, construction, operations, and owner) average of 70-72% of project over budget and over schedule! Leave design-bid-build and even design-build behind if you truly want to maximize your limited facilities management resource to the betterment of your organization.

article thumbnail

Life Science Building Design & Construction: 5 Considerations for Success

Stok

With their strict technical requirements and rigorous performance standards, laboratories and other high-tech life science facilities present a unique opportunity for sustainable design and construction innovation. If the space can’t perform to exact requirements, the tenant can’t use it and the schedule is delayed.

Design 52
article thumbnail

Life Science Building Design & Construction: 5 Considerations for Success

Stok

With their strict technical requirements and rigorous performance standards, laboratories and other high-tech life science facilities present a unique opportunity for sustainable design and construction innovation. If the space can’t perform to exact requirements, the tenant can’t use it and the schedule is delayed.

Design 52
article thumbnail

The Ultimate Guide to Choosing the Best Project Delivery Method

Autodesk Construction Cloud

While a project’s ultimate goal is a successful completion, the steps it takes to get there are critical to profits and project’s life cycle. By choosing the right one for your project, overall risk can be reduced, and budget and schedule can be better managed. Schedule: a timetable for completion and payments.

Risk 52