Remove Documentation Remove DOT Remove Overhead Remove Plans
article thumbnail

The Future of the New-Home Design Studio

Pro Builder

Who in your company is tasked with the content creation for the data loaded into digital tools, options-specific software, and hard-copy documents that communicate the design options available? More importantly, builders need to start realizing that “garbage in” means “garbage out.” doesn’t typically yield concrete answers. .

Design 98
article thumbnail

Prepare for Management Compensation and Bonus Reviews

PSMJ Resources

This guidance applies to both prime and subconsultants for state Departments of Transportation (DOTs). DOT is increasing their scrutiny of Local Project Administrators (LPAs) and expecting these administrators of federal grant funds to adhere to the same guidance as in the AAAHTO Guide. Was this news to you?

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage Risk 

Autodesk Construction Cloud

An example of a data point might be the number of overhead mechanical racks installed on the job that day, or logging the root cause of a safety incident. From here you can apply more context and processes to an increasing number of information sets, which means you can start to connect the dots and identify patterns.

Risk 52
article thumbnail

OSHA Safety

Safety Services Company

In addition, your daily inspection sheet should provide documentation proving that the company is doing its part to ensure a safe worksite. . Required permits such as confined space entry, welding – hot work or DOT permits. Material handling schedules, stacking schedules, overhead hoisting and material deliveries.

OSHA 48
article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

You describe what will be delivered when, how much the customer owes, and sign on the dotted line. They also include overhead costs such as insurance, mileage, a portion of your office rent. The GMP includes costs for labor, materials, overhead, and a percentage of those costs to generate a profit. If only it were that simple.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. If the insulation is known or suspected to contain asbestos, check the building’s asbestos management plan to see it has been tested for asbestos.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. Last Updated: February 19, 1999. Best Practices.