Remove Documentation Remove Drawings Remove Inspections Remove Roads
article thumbnail

What Are As Built Drawings?

Autodesk Construction Cloud

If a picture can speak a thousand words, in a project, as-built drawings can speak a thousand construction processes. But in all seriousness, with the hundreds and thousands of steps and documents needed to complete just one project, as-builts might be overlooked for their importance. Shop drawing changes. Key Takeaways.

article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

Review drawings and designs one final time At the start of the meeting, all drawings and designs should exist in a state of approval. The stark realities of complex coordination, inspection timelines, and closeout seem mercifully far away. However, if there’s a problem, you want to catch it up front.

article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

This software can help in drafting & documenting, designing, visualizing & analyzing & so on. Software Required for Drafting or Drawing. Software for Road Designing & Analysis. Bently Road Network. Bently Road Network-. Civil Design Software for Road Networks. #5. Primavera P6.

article thumbnail

Some vital points required for construction bid formation

Construction Cost Estimating

CAREFUL STUDY OF THE CONTRACT DOCUMENTS: The contract documents which are provided to the contractor or delivered for his inspection comprise of general contract conditions, drawings, specifications, bills of quantities etc.

Bidding 40
article thumbnail

Addressing the Global Construction Labor Shortage: 3 Proven Steps to Success

Autodesk Construction Cloud

Stay on top of inspections and compliance audits Stay up-to-date with relevant safety regulations and standards to ensure full compliance. The smartest way to handle this is by doing regular audits and inspections. Moreover, this cohort is more open to technologies like AR, VR, and digital design and drawing tools.

AGC 105
article thumbnail

We plan to fail by failing to plan

Fieldwire

Yes, we do plan on a macro level, spending a great deal of time on documents such as the master schedule, the construction drawings, and the project specifications. For this example, I want to look at how they have sorted out the complicated from the complex with their Features of Work documents. This is tough work.

Plans 52