article thumbnail

“Show Me”: Assessing The Foundation For Worker Training

FDR Safety

Unfortunately, we find that much of this training has no foundation… Let me explain. I have done hundreds of Task Based Risk Assessments and handled expert cases for OSHA or personal injury where there is no foundation for the worker “training.” Show me” is a simple and fast way to assess the foundation for worker training.

article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. The problem areas, effects in foundation and defects in structure due to those causes are presented here. Insufficient width of foundation Settlement of foundation occurs due to insufficient distribution of load.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Rubble Stone Soling: The rubble stone generally used are of best variety of black trap / granite / basalt or other variety of stone available locally. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) A theodolite may be used for marking accurately the axial lines ‘or’ center lines.

article thumbnail

LEAN Job Order Contracting – Getting the most out of available funds

Job Order Contracting

Contact Us. Our robust processes and technology deliver a best value solution and a solid foundation for continuous improvement. Training and support are central to our philosophy of improving the capabilities of our clients and partners and help to assure knowledge growth and retention.

Contract 240
article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

Step Three/Phase III – Construction Our systemized process sets us up to quickly mobilize our equipment and efficiently move through construction with the means to keep the owner regularly updated on the project progress, meet schedule milestones, obtain necessary documentation to protect our clients during and after construction.

article thumbnail

Assessing Feasibility

FDR Safety

The answers can be determined but only after documented due diligence using Task Based Risk Assessment (past blogs) and assessing feasibility of hazard controls. coupled with lower order controls (Awareness, Training and Procedures and PPE) is typically used to achieve acceptable risk.