Remove Drawings Remove Information Remove Insurance Remove Overhead
article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. . Architectural drawings. Certificates of insurance. Supplier information. Insurance .

article thumbnail

Job Order Contract Coefficient – Training 101

Building Information Management

Which costs many or may not be included in the coefficient should be clearly spelled out in the JOC Request for Information, Request for Proposal, and/or Solicitation. Examples of costs that may be included in the coefficient include: General and administrative and other overhead costs. insurance costs. As built drawings.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

f) “Job order contractor” – a licensed, bonded, and general liability insured contractor awarded a job order contract. (g) The proposal may also contain approved drawings, work schedule, permits, or other documentation as the organization may require for a specific job order. The prices shall not include overhead and profit.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

Instead, the Government applies “area cost factors” or “location factors” to attempt to localized the cost information. general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a)

Contract 226
article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

They also include overhead costs such as insurance, mileage, a portion of your office rent. These types of contracts are especially useful when you don’t have enough information to provide a thorough estimate of work or the scope is not well-defined. That’s the cost part of the name. That’s the “plus.” . Unit Price Contract.

article thumbnail

Construction Forms for excel

Construction Cost Estimating

Construction Forms for Excel include : Estimation Forms for Construction: Bid Plan Log, Time and Materials Log, Estimate Sheet, Job Estimate, Telephone Bid Sheet, Itemized Proposal, Job Cost Report, Take Off Estimate, Time and Materials Estimate, Request for Proposal Log, Overhead Calculation.

Lien 45
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). The ORGANIZATION NAME Procurement Authority will authorize a Job Order (JO) for performance of work, or request additional information/changes. The UPB costs should NOT include contractor overhead and profit. authorization. UPB rate and the Contractor’s multiplier. Scheduling.

Contract 100