article thumbnail

GANTRY GIRDER DESIGN BASIS

The Constructor

Overhead travelling cranes are used in factories and workshops to lift heavy materials, equipments, etc and to carry them from one place to the. Steel Design Steel Structures Structural Design Structural Engineering design of gantry girder Gantry girder Structural'

Design 175
article thumbnail

RCC WATER TANK DESIGN BASIS

The Constructor

The design depends on the location of tanks, i.e. overhead, on ground. Reinforced Concrete Water tank design is based on IS 3370: 2009 (Parts I – IV).

Design 230
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

article thumbnail

PSMJ Resources, Inc. Announces 2014 Circle of Excellence

PSMJ Resources

PSMJ''s Circle of Excellence is designed to highlight firms that are successfully managed, based on 13 key performance metrics that demonstrate outstanding achievements in profitability, staff growth, cash flow, productivity, business development, overhead management and turnover. Director of PSMJ''s A/E/C Industry Surveys. KL&A Inc.

article thumbnail

The high cost of low maintenance

BD+C

The longer maintenance is deferred, the more the structure deteriorates. In addition to high repair costs, the structure is at risk of a structural failure that can lead to the demolition of the structure. Structural engineers are typically asked: “What are the reasons for deferring required maintenance for a structure?”

article thumbnail

Rory Woolsey's Construction Estimating Blog: A New Year in.

Rory Woolsey

Rory Woolsey has worked in Management and Engineering for the construction industry for 35 years, starting as a construction laborer in Billings, Montana, in 1972. Mr. Woolsey has earned a Bachelor of Science degree in Civil/ Structural Engineering and a Masters degree in Business Administration. Labor Productivity?

article thumbnail

Rory Woolsey's Construction Estimating Blog: Costing Construction

Rory Woolsey

Bare is exactly that; it is the bare cost of the direct activities less any mark ups for labor burden, taxes, bond, overhead and profit. All direct costs are then adjusted to include home office overhead and profit for the installing contractor. Site overhead costs can be 5% to 15% of the overall project cost.