article thumbnail

Lumber Standard Committee approves new Southern Pine design value changes

BD+C

The American Lumber Standard Committee Board of Review has approved the Southern Pine Inspection Bureau’s design value changes for all sizes and grades of visually graded Southern Pine dimension lumber. SPIB will publish the new design values in its Supplement 13 to the Standard Grading Rules for Southern Pine Lumber, 2002 Edition.

Design 40
article thumbnail

Southern Pine Inspection Bureau publishes new design values effective June 1

BD+C

New design values for all sizes and grades of visually graded Southern Pine dimension lumber were published in the Southern Pine Inspection Bureau’s (SPIB) Supplement No.13 13 to the 2002 Standard Grading Rules for Southern Pine Lumber on Feb. read more.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Are Green Building Rating Systems Really Sustainable?

Natural Building

Since 2002, I have contended that truly sustainable buildings would create net public benefits to over-compensate for their (currently) unavoidable material flows and embodied impacts. Therefore, in 2010, I proposed a tool for measuring and visualizing cumulative and tributary socio-ecological impacts.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. 2002), Willis’s practice & procedure for the quantity surveyor. eds) (2002), Design and Construction: Building in value , Butterworth – Heinemann, Woburn. 1, March 1996, pp.5-14

article thumbnail

Revit OpEd: Egress Path Options

Revit OpEd

Thats not a requirement but it does make it easier to visualize it in 3d views. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. They are also derived from a path and we can use a profile to represent the form of a person traveling through a corridor. My Loyal Readers!

Revit 81
article thumbnail

Revit Beginners: Applications

Revit Beginners

Innovaya also does visualization, communication, quantity takeoff, construction simulating, and so on. in 2002 and am currently a member of AUGI. Cost will do cost estimating. Interfaces with Primavera. Innovaya & Timberline – Also does cost estimating and will interface with Primavera and Microsoft Project. David Duarte.

Revit 40
article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

Improves stability and performance when using visualization features like Sky, Exposure, and Anti-Aliasing. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. Disables Sun and SunPath from being rendered in Raytrace mode. Improves stability when rendering views. Other Links.

Revit 61